Water Distribution Network
Monitor and manage water distribution across Sydney zones
Sydney CBD Distribution Zone
45,000 customers • 2850 L/min flow rate
OPTIMAL
Efficiency: A+
Primary Booster Pump P-001
Sydney CBD Station • Centrifugal Pump
8% Failure Risk (30 days)
Operational
Flow Rate
2850 L/min
Pressure
85 kPa
Power Draw
247 kW
Runtime
18760 hrs
Vibration Level4.2 mm/s
Temperature58°C
Bearing Condition92%
24-Hour Vibration Analysis
00:0006:0012:0018:0024:00
Maintenance Recommendations
- •Schedule bearing lubrication within 2 weeks
- •Monitor vibration levels daily
- •Check alignment during next maintenance window
Secondary Pump P-002
North Shore Distribution • Variable Speed Pump
24% Failure Risk (30 days)
Operational
Flow Rate
2340 L/min
Pressure
78 kPa
Power Draw
189 kW
Runtime
15420 hrs
Vibration Level6.8 mm/s
Temperature72°C
Bearing Condition78%
24-Hour Vibration Analysis
00:0006:0012:0018:0024:00
Maintenance Recommendations
- •Replace bearings within 30 days
- •Inspect impeller for wear
- •Consider pump overhaul
- •Increase monitoring frequency to twice daily
Backup Pump P-003
Eastern Suburbs Hub • High Pressure Pump
3% Failure Risk (30 days)
Standby
Flow Rate
0 L/min
Pressure
0 kPa
Power Draw
0 kW
Runtime
8940 hrs
Vibration Level2.1 mm/s
Temperature35°C
Bearing Condition96%
24-Hour Vibration Analysis
00:0006:0012:0018:0024:00
Maintenance Recommendations
- •Excellent condition - continue routine maintenance
- •Test run monthly to ensure readiness
- •Standard 6-month service interval
Distribution Pump P-004
Inner West Network • Multi-Stage Pump
42% Failure Risk (30 days)
Operational
Flow Rate
2180 L/min
Pressure
76 kPa
Power Draw
198 kW
Runtime
22150 hrs
Vibration Level9.2 mm/s
Temperature81°C
Bearing Condition65%
24-Hour Vibration Analysis
00:0006:0012:0018:0024:00
Maintenance Recommendations
- •URGENT: Schedule immediate maintenance
- •Replace bearings and seals
- •Check motor alignment
- •Consider temporary pump replacement
- •Increase monitoring to hourly intervals
Transfer Pump P-005
Western Sydney Main • Axial Flow Pump
16% Failure Risk (30 days)
Operational
Flow Rate
3890 L/min
Pressure
74 kPa
Power Draw
289 kW
Runtime
19680 hrs
Vibration Level5.4 mm/s
Temperature64°C
Bearing Condition84%
24-Hour Vibration Analysis
00:0006:0012:0018:0024:00
Maintenance Recommendations
- •Schedule bearing inspection within 4 weeks
- •Monitor temperature trends
- •Plan preventive maintenance in next quarter